Verified M-9 Corridor (136 km)
Site 01 • Weigh Station Hoarding

Karachi Weigh Bridge — Mega Wall

Format: Mega wall / weigh station branding. Core Strength: Night visibility + high dwell time. Available from November 2026 (currently occupied on an annual contract).

Site 01 Operational Specification

Documented directly from company profile. Currently occupied on an annual contract. Advance reservation inquiries are open for November 2026 occupancy.

Occupied on Annual Contract

Unmatched Dwell Time for Freight & Intercity Fleets

The Karachi Weigh Bridge is a mandatory inspection checkpoint on the M-9 Motorway. All heavy freight vehicles, logistics carriers, container haulers, and commercial transit slow down, queue, and undergo axle weighing procedures.

This operational reality produces extraordinary multi-minute dwell times, guaranteeing thorough message absorption that high-speed flybys cannot provide.

Status:Available from November 2026
Night Visibility:Dedicated Night Floodlights
Profile Note: Exact size and final monthly rate will be confirmed at the time of booking.
Karachi Weigh Bridge Mega Wall Billboard Site Photo
Karachi Weigh Station Corridor Axis
Available Nov 2026

Mandatory inspection corridor checkpoint commanding high vehicle dwell times along M-9 Expressway.

Request Media Proposal & Rates

M-9 Highway OOH

Direct owner-level coordination. Rates & verified M-9 inventory.

Direct Line: 0318 308 6569 • WhatsApp 24/7