Verified M-9 Corridor (136 km)
Verified Physical Highway Assets — M-9 Corridor

Outdoor Advertising Inventory: Karachi to Hyderabad

Explore real M-9 motorway gantries, Bahria Town entry walls, interchange flyover boards, and toll plaza displays. Check recorded technical dimensions and request live face availability.

Karachi Toll Plaza Gantry 310 by 7 ft Verified Outdoor Highway Advertising Inventory
310×7 ft Karachi Toll Plaza GantryVerified Asset

Booking Safeguards

  • Authoritative Source: Specifications direct from 2026 profile.
  • Live Status Protocol: All sites marked 'Ask for availability'.
  • Full Production Scope: Panaflex printing & mounting coordination.
Authentic Location Directory: The 8 core advertising formats listed below represent Green Marketing Pakistan's documented highway inventory on the 136 km Karachi–Hyderabad M-9 corridor. Dimensions, lighting conditions, and structural configurations are taken verbatim from our verified company profile.

View Real Advertising Formats and Locations

Answer: The GMP 2026 profile identifies Karachi Toll Plaza, Bahria Town Karachi, seven motorway interchange boards, Hyderabad Toll Plaza, Karachi Weigh Bridge, three creative U-turn locations and highway mileage sponsorship inquiries. Recorded site dimensions and operating restrictions help initial planning. Current availability, prices and permissions must be reconfirmed for every booking.
Location & FormatDimensionsOperational DetailsStatus
Karachi Toll Plaza GantryDouble-sided motorway gantry310 × 7 ftSpans entire roadway width; captures 100% decelerating vehicular traffic entering and leaving Karachi.Lighting: Front-lit / AmbientAsk for current availability
Bahria Town Entry Island WallLarge arterial island wall200 × 24 ftSingle large advertising-side arrangement directly at the gated island approach to Bahria Town.Lighting: Ambient highwayAsk for current availability
Bahria Town V-Form Dual DisplayDouble-sided angled V-form60 × 20 ft (Each side)Single- or double-side commercial booking options reaching high-affluence daily commuters.Lighting: Ambient highwayAsk for current availability
M-9 Interchange Overhead BoardsOverhead bridge flyover boards (7 structures)60 × 20 ft eachSeven double-sided overhead vehicular flyover bridges across the entire Karachi–Hyderabad highway.Lighting: Non-illuminated (Source Profile)Ask for current availability
Hyderabad Toll Plaza GantryDouble-sided motorway gantry320 × 7 ftTerminal northern gantry capturing all commercial transport entering Hyderabad and interior Sindh.Lighting: Non-illuminated (Panaflex)Ask for current availability
Karachi Weigh Bridge Mega-WallAxle-load inspection mega-wallSize to confirmSource projection: available November 2026; reconfirm current booking availability with desk.Lighting: Night illuminationProjected Nov 2026 — Verify
Creative U-Turn Roundabout IslandsThree creative turnaround installationsCustom site-specific sizesHigh-dwell turnaround points with repeated local exposure and slow vehicle speeds.Lighting: Site-specificAsk for current availability
NHA Highway Mileage SponsorshipOfficial NHA destination signage sponsorship6 × 8 ftContinuous standardized highway milestone markers; sponsorship permissions require verification.Lighting: Non-illuminatedSubject to NHA allocation

Featured M-9 Location Gallery

Karachi Toll Plaza Gantry 310x7 ft

Karachi Toll Plaza (310 × 7 ft)

Double-sided gantry, 100% decelerating dwell time.

Bahria Town Entry Island 200x24 ft

Bahria Town Entry Island (200 × 24 ft)

Massive arterial wall targeting affluent commuters.

M-9 Motorway Interchange Bridge Boards 60x20 ft

Seven Interchange Bridges (60 × 20 ft each)

Overhead vehicular flyovers across 136 km corridor.

Hyderabad Toll Plaza Gantry 320x7 ft

Hyderabad Toll Plaza (320 × 7 ft)

Northern terminal gantry, non-illuminated Panaflex.

How to Check Availability and Book

Answer: Select a location, identify the desired display face (Karachi-facing or Hyderabad-facing) and time period, then request site confirmation and an itemized quotation. Review production and installation responsibilities before approval. Publicly displayed 'available' labels must carry a verified update date or be replaced with a request-to-check message.