Verified M-9 Corridor (136 km)
Commercial Proposals & Reservations

Request Highway Media Plan & Quote

Custom monthly packages tailored to your brand objectives, campaign duration, and corridor reach. Direct owner-level coordination ensures rapid turnaround.

Next Step Guidance

What We Need From You (Slide 20)

To lock a campaign on this corridor, please confirm these three points:

1
Preferred SitesSelect individual sites (one or two sites) or a strategic bundle package.
2
Campaign DurationFlexible commitments: 1 month, 3 months (quarterly), 6 months, or 1 year (annual).
3
Side RequirementSingle-side orientation or high-impact double-sided visibility.
M-9 Motorway Complete Highway Takeover Media Planning
M-9 Corridor Complete Highway Takeover Bundle
Bundle Suggestion:

M-9 Complete Highway Takeover

Karachi Available Gantry Side (310 × 7 ft) + Bahria Town Entry Island (200 × 24 ft) + 2 Interchange Bridges (60 × 20 ft each) = A commanding 4-point highway takeover guaranteeing inescapable brand impressions at both toll entry points and midway residential corridors.

Prefer an Instant Direct Message?

Skip the form and message our operations desk directly on WhatsApp. We can immediately send real-time photos, current occupancy lists, and rate cards.

Chat on WhatsApp: 0318 308 6569

Request Media Proposal & Rates

Digital Marketing

Data-driven Google Ads, Meta Ads, SEO, and lead funnels.

Direct Line: 0318 308 6569 • WhatsApp 24/7